Fahrwasser
Batch release for pharmaceutical manufacturing

Your batch is done.Your release is not.

Release within 2 working days of the last test result. Without replacing your validated systems.

A container ship seen from above sailing through a wide fairway
Day 8released on day 2
12–18 daysIndustry average to release, incl. QC testing¹
QC stays. Waiting doesn’t.We don’t shorten lab time, but we do cut the idle time after it.
0 systems replacedSAP, LIMS and MES stay. The interface is validated on its own.

¹ IntuitionLabs, Pharma KPI Benchmarks 2026

What the wait costs

Every day in quarantine is finished goods you are not allowed to sell.

The batch is produced, the test results are in. Then it waits to be compiled, reviewed and signed. Use your own figures to see how much capital this wait ties up and how much QA time it costs.

Annual saving€60,781in cost of capital and QA effort if release takes 2 instead of 8 days
Releases per year200
Manufacturing cost per batch€60,000
Days to release8 days
QA/QP hours per batch6 h
€197,260Capital freed once
600 hQA time freed per year
4.4Batches in quarantine today
How we calculate ›

Releases × waiting days ÷ 365 = batches in quarantine at the same time on average; × manufacturing cost = tied-up capital (inventory is carried at manufacturing cost). Target 2 days, cost of capital 8% p.a. on the capital freed. QA effort: assumes 50% less review time through Review by Exception, €75/h fully loaded. A documented MES case shows 70% (Körber, Sharp Packaging).

Why it pays off

Waiting costs more than capital.

Risk

Anyone supplying the US knows the risk

Remediation after an FDA warning letter costs around USD 750,000 on average, in some cases tens of millions. Data integrity is a recurring focus of the findings, and data transferred by hand between systems is a typical weak point.

Source: Water Online (avg. remediation); FDAnews, West-Ward/Hikma
Time

The Qualified Person (QP) reads 66 entries to find 2

Paper-based releases typically take 10 to 40 days, a single review 48 hours on average. In the example below, 2 of 66 entries carry an exception. All of them are read anyway.

Source: BioPharm International
Inspection

Annex 11 is being revised. Audit trails move into focus.

The draft revision of July 2025 tightens the requirements for audit trails, their regular review and data exchange between systems. Exactly where e-mail and Excel bridge the gaps today. The final version is about to be published.

Source: European Commission / PIC/S, consultation draft July 2025
Why it takes so long

A missing system is rare.A missing connection is common.

Your systems are validated and running. The problem sits between them: the QP collects printouts from six systems, a lab technician retypes certificate values, and someone sets the status in SAP the next day.

Printouts from six systems.The QP reads every entry.

to reviewquery by email
66Entries to review
34Queries by email
8Days to release
Our approach

Connect, review only the exceptions, sign in one step.

A ship in a river bend, people on the bank waving
01 · Connect

We connect, we do not replace

Your systems stay as they were validated. We fetch specification, result and batch status through existing interfaces and write back only the release status. The interface goes through your change control and is validated as a system in its own right.

The journey of a batch

From certificate of analysis to release

Five steps, example data. Swipe through.

Goods receipt1 / 5

The active substance has arrived. Is the certificate right?

Today

A lab technician types the values from the PDF and compares them with the specification in the binder. Around 20 minutes per delivery.

Deviation2 / 5

The deviation raises itself

Today

Word template, data copied from three systems, a number from the Excel list. Someone sets the block in the ERP when they remember.

CAPA3 / 5

Root cause, actions, effectiveness in one place

Today

Actions in Excel, deadlines in personal calendars. The effectiveness check often only gets noticed in the audit.

Release cockpit4 / 5

Everything the release needs, at a glance

Today

The QP gathers printouts from LIMS, MES and SAP and pages through the entire batch record.

Release5 / 5

Signed electronically, status in SAP at once

Today

Signature on paper, scan, filing. Someone sets the status in SAP by hand, often only the next day.

Validation

Validatable from the first line of code.The documents come with it.

Software that doesn’t survive your validation is not a relief, it’s a finding. That is why the validation package is part of the fixed price, not a service sold afterwards.

GAMP 5EU GMP Annex 1121 CFR Part 11ALCOA+Audit trailE-signature
User requirements (URS) and risk assessmentGAMP 5 category, functional risk, test depth, agreed with your QA.
IQ / OQ / PQ templatesPrepared for the delivered configuration. We run IQ and OQ with you; PQ and approval remain with your QA.
Supplier qualificationQuestionnaire answered, development process documented, on-site audit possible.
Audit trail to Annex 11 (draft revision)Immutable, sortable and searchable, exportable for inspection.
Process and pricing

Three steps, one fixed price.You pay the rest once it runs.

  1. 1free of charge

    Process quick check, 30 minutes

    Six questions on batches, systems and release time. Afterwards you know which building block brings the most and what it costs. No presentation, no pitch.

  2. 2Deposit

    Award and implementation

    Fixed scope, fixed price, requirements signed off together. Your IT and QA are involved from the first week.

  3. 3Final payment

    Delivery with validation package

    The final payment is due when the building block runs in your plant and the validation documents are in place. Not before.

Building blocks and pricing

Four building blocks, each at a fixed price.

  • Read certificates, check them against the approved specification from SAP, raise a deviation directly. The fastest way in: one process, one goods receipt.

  • All release-relevant data per batch in one view, Review by Exception, Part 11 signature, status back to SAP.

  • From the report to the effectiveness check, with deadlines and responsibilities. Every open deviation is visible in the cockpit before it holds up the release.

  • A new SOP version is approved: the system uses the training matrix to determine who is affected, creates the training requirement and tracks the record through to confirmation. In an inspection, every record for the current version is available at once.

Further stages on the same data: Change Control, Product Quality Review.

Check for my plant
What your QA will ask

Before you call

We replace nothing. We read through existing interfaces and write back only the release status. This interface is a change to your system landscape and goes through your change control. We supply the validation to GAMP 5; the validation of your existing systems remains untouched.

No. Your training stays with you. We make sure every new SOP version triggers the training requirement for all affected roles, deadlines are tracked, and every record is linked to the right version.

We do not use generative AI for release-relevant decisions. Extracted values are shown next to the original and confirmed by a person; every confirmation is in the audit trail. The draft of the new Annex 22 allows only static, deterministic models in critical GMP applications. Our solution is built to that.

URS, risk assessment, IQ/OQ/PQ templates and supplier qualification are included in the fixed price. We run IQ and OQ together with you. PQ and approval stay with your QA, as they must.

Yes. The basis is EU GMP with Annex 11, which applies to every manufacturer with a manufacturing authorisation. We also cover 21 CFR Part 11 in case you supply the US.

[ZEITRAUM] for the first building block, depending on your interfaces. We give you the realistic figure for your plant after the quick check, not before.

Who builds it

Process knowledge, product quality, security

ERP experience from industry, software for Google and the German federal government, expertise in cybersecurity.

Nico de Souza
Nico de SouzaERP, QMS, processes and interfaces
  • Founder of Codetaris: AI, interfaces and extensions for ERP landscapes
  • More than ten international S/4HANA projects as project lead and solution architect
  • Over ten years between business processes and IT, including leadership roles in industry
Marius Jopen
Marius JopenSystem architecture, interfaces and AI
  • Co-founder of 100k Studio and THE ROBOTS
  • AI pipelines and applications in production
  • S+T+ARTS Grand Prize 2025
Felix EggsteinYour first point of contact
  • More than ten years of cybersecurity and cloud networks for enterprise clients
  • Project development from first enquiry to signed contract
  • Lead architect at tensorprox. Anomalies in blood.
Process quick check30 minutes · free of charge

Six questions. Then you know whether we are the right fit.

We only call back if your plant fits what we build. Otherwise we tell you where you would be better served.

Does your site hold a manufacturing authorisation under § 13 AMG?

Question 1 of 6